Scope
Main switchboards
Main AC and DC distribution boards, protections, labelling and drawings.
PMS
Power Management System: automatic source and load management, consumption priorities, smooth transfer.
Generator control
Start, synchronisation and supervision of generators, with automatic connection to the vessel's network.
Batteries & charging
AGM and lithium banks, chargers, inverter/chargers, autonomy studies.
Shore power
Shore connection, galvanic isolation, safe charging at the berth.
Uninterrupted supply
UPS for critical loads: instruments, communications and alarms never lose power.
Energy study
Every proposal starts with measurement: load survey, the vessel's usage profile and real autonomy needs. The installation is sized on your numbers, not on assumptions.
The result is delivered with drawings, settings and manuals; the next technician finds a documented system.
How we work
Survey & study
Load survey, inspection of the existing installation, costed proposal.
Installation
Clean work at the marina or yard, every circuit labelled.
Documentation
As-built drawings, settings, manuals; deliverables that stay aboard.
Want monitoring on your phone too?
PMS pairs naturally with automation and remote monitoring.
FAQ
Often yes; it takes a check of chargers, wiring and protections. The study shows what stays and what changes.
It depends on your loads and the space available for banks. Measuring consumption gives you a realistic number, not a promise.
Yes, in a simpler form: load priorities and automatic source transfer are worth it even under 20 metres.
24/7 · +30 697 410 2604
Contact